Monday, June 4, 2018

June’s House

 May added quite a bit to the exterior in the completed brick. Selecting brick from a sample, viewing on a computer, and hoping the actual selection would be our vision didn’t escape our thoughts. Continued rain in May delayed the process as it ended being the wettest May since 1950. However we were happy that our worries disappeared behind the stormy clouds.



We are anxious to see the porta potty and mountain of dirt to disappear also!
















Selecting siding from a sample was our second stress. Since our house will be in a neighborhood we (I) didn’t want to be a copy of those surrounding it. The selection was Sand from ABC Supply. With the first few panels on one end the color seems to be a winner! Now if the weather and installation will proceed this week it would be a perfect beginning to June!




 The inside work was a bit daunting as the new inspector had some changes he deemed necessary due to new regulations. I am not so sure our builder is happy at this point. One huge $$$ issue is that the entire unfinished basement ceiling requires drywall. We didn’t expect this as the basement level will be utilized for storage of lawn equipment and storage bins. Due to this change we have talked of letting them mud and sand it and we will paint the ceiling and apply waterproofing to the walls ourselves. This space will take on a light and bright space for sure.






 The application of insulation is giving a first glance of room size. Of course, it is only applied to the outside walls so a portion is still a pattern of 2x4 studs.




 A peek into the study makes us excited to enjoy the view of East Tennessee’s mountains.

I
 
Patience is a constant prayer as June has arrived. We won’t drop by this week so we are hoping for completed siding and dry walled spaces!



Jeanne

No comments :

Post a Comment

Blog Design by Get Polished | Copyright 2016